Mostrando 2 resultados de: 2
Agent scheduling in unrelated parallel machines with sequence-and agent–machine–dependent setup time problem
ArticleAbstract: Assignation-sequencing models have played a critical role in the competitiveness of manufacturing coPalabras claves:Agent scheduling, Dependent setup times, makespan, Unrelated parallel machinesAutores:Cárdenas-Barrón L.E., Rodrigo E. Peimbert-Garcia, Vázquez-Serrano J.I.Fuentes:scopusThe impact of early failures on maintenance costs: an empirical study in Latin America
ArticleAbstract: Purpose: Literature shows that the economics of early failures in maintenance and electric utilitiesPalabras claves:Cost-of-quality, Early failures, Electric utility, PAF model, Power systemsAutores:Limon-Robles J., Rodrigo E. Peimbert-Garcia, Vázquez-Serrano J.I.Fuentes:scopus