Mostrando 2 resultados de: 2
Filtros aplicados
Subtipo de publicación
Conference Object(2)
Publisher
2018 IEEE 3rd Ecuador Technical Chapters Meeting, ETCM 2018(1)
Proceedings of the 2012 6th IEEE/PES Transmission and Distribution: Latin America Conference and Exposition, T and D-LA 2012(1)
Renewable resources concession-based funding mechanism for attaining large-scale power plants
Conference ObjectAbstract: The construction of electric power generation megaprojects involves enormous economic efforts that gPalabras claves:concession, funding mechanism, generation planning, Investments, large scale, Renewable, ResourcesAutores:Paul Vásquez, Santiago Pilaquinga, Vaca A.Fuentes:scopusMethodology for Estimating the Cost of Energy not Supplied -Ecuadorian Case-
Conference ObjectAbstract: The value that electric companies assign to the reliability of their electric power supply is a keyPalabras claves:CENS, direct methodology, Economic losses, interruption costs, planning, productive losses, reliability, VoLLAutores:Paul Vásquez, Vaca A.Fuentes:googlescopus