Mostrando 5 resultados de: 5
Filtros aplicados
Publisher
2017 IEEE 2nd Ecuador Technical Chapters Meeting, ETCM 2017(1)
2017 IEEE PES Innovative Smart Grid Technologies Conference - Latin America, ISGT Latin America 2017(1)
2019 IEEE 4th Ecuador Technical Chapters Meeting, ETCM 2019(1)
IEEE Industry Application Society - 51st Annual Meeting, IAS 2015, Conference Record(1)
IET Generation, Transmission and Distribution(1)
A harmonic power flow program aimed at analyzing distortion effects caused by industrial customers
Conference ObjectAbstract: One of the major concerns in the power quality analysis in power systems is the voltage and currentPalabras claves:Current injection, Harmonic Power Flow, hydropower plants, industrial nonlinear loads, transformer saturationAutores:Franklin L. Quilumba, Gabriela Cabrera, Gonzalo Esteban Constante-Flores, Jeśus A. Játiva-Ibarra, Lee W.J.Fuentes:googlescopusDetermination of the Thevenin equivalent in power grids using real records based on short circuit power
ArticleAbstract: In recent years, methods for loadability determination based on real-time measurements have been proPalabras claves:Autores:Antonio Fonseca, Fabián E. Pérez-Yauli, Franklin L. Quilumba, Gabriel SalazarFuentes:scopusMethodology for Assessment and Improvement of Long-Term Voltage Stability of Electric Power Systems
Conference ObjectAbstract: A new methodology for the evaluation and improvement of the voltage stability of a power system is pPalabras claves:Active power bkp_redispatch, Continuation power flow, Load shedding, power system, Voltage stabilityAutores:Franklin L. Quilumba, Nelson V. Granda, Wilson SanchezFuentes:scopusStudy and analysis of harmonic disturbances in the network of the quito electric company to the incorporation of the metro system in quito
Conference ObjectAbstract: The Quito Metropolitan District is committed to solve its existing traffic congestion problems in thPalabras claves:Electric Traction Substation, Electrical System of Metro de Quito, Empresa Eléctrica Quito, Grid Modeling, Harmonic Power Flow.Autores:Fabián E. Pérez, Franklin L. Quilumba, Hugo N. Arcos, José A. Marín, Mauro F. JuradoFuentes:scopusThree-phase recloser time delays determination in 138 kV and 46 kV lines of the Empresa Eléctrica Quito
Conference ObjectAbstract: The present study is performed with the objective of applying an adequate methodology to determine tPalabras claves:138 kV lines, 46 kV lines, auto-reclosing in subtransmission lines, Empresa Eléctrica Quito, three-phase recloser time delayAutores:Andres Pereira, Fabián E. Pérez-Yauli, Franklin L. QuilumbaFuentes:scopus