Mostrando 2 resultados de: 2
Long-term audit staff scheduling and planning: A case study of Brazilian civil aviation authority
ArticleAbstract: This paper provides a customized optimization approach for the long-term audit staff scheduling probPalabras claves:Audit staff scheduling, integer programming, optimization problem, Workforce planningAutores:Denis Borenstein, Ferreira L., Gamermann R.W.Fuentes:scopusPrevision and optimisation of repairable spare parts: A case study in the petroleum industry
ArticleAbstract: This study was motivated by the high costs incurred by an energy company for repairable spare partsPalabras claves:Autores:Denis Borenstein, Ferreira L., Gonçalves Calvacante D.Fuentes:scopus