Implementación de un sistema de costos por órdenes de producción para las comidas y bebidas que oferta Ecopark Monte Selva, ubicado en la provincia de Pastaza, ciudad de Puyo, sector Santa Rosa, período del 01 al 31 de enero del 2015


Abstract:

This work research is implementing a cost system production orders for meals and drinks offered by the company Ecopark, contributing to determine the cost unit of each product and profitability in the restaurant area. For the development of the subject, it has been using tools and research techniques such as interview, survey and observation sheets, which allowed to analyze the actual situation of the company, where it was identified that the main problem is not having a cost system to assessing the participation of the three elements of cost (raw material, labor and manufacturing overhead costs) in the production process. Thus the implementation of this system costs constituted an useful tool to ensure obtaining resources for achieving goals and management objectives….

Año de publicación:

2016

Keywords:

  • COMIDAS Y BEBIDAS
  • Implementación
  • PRODUCCIÒN
  • Sistema de costos

Fuente:

rraaerraae

Tipo de documento:

Bachelor Thesis

Estado:

Acceso abierto

Áreas de conocimiento:

  • Contabilidad
  • Contabilidad
  • Ingeniería industrial

Áreas temáticas de Dewey:

  • Dirección general
  • Producción