Implementation of S-DBR in four manufacturing SMEs: a research case study


Abstract:

Production planning and control systems (PPCs) are tools that have a major effect on the performance of manufacturing companies. An inappropriate determination of the applicability of PPCs could seriously jeopardise the ability to achieve competitive priorities. This mistake can be expensive for any company, but proper implementation is particularly critical for small and medium enterprises (SMEs), which are characterised by limited access to financial resources. Simplified Drum–Buffer–Rope (S-DBR) is a PPC control approach that is characterised by minimum detail in the planning stage and a primary emphasis on the control of execution. Therefore, this approach is a suitable choice for the highly variable context of SMEs. This study aims to explore the practical issues related to S-DBR implementation in four Ecuadorian SMEs through case study research. The case analysis within this study first identifies the …

Año de publicación:

2015

Keywords:

    Fuente:

    googlegoogle

    Tipo de documento:

    Other

    Estado:

    Acceso abierto

    Áreas de conocimiento:

    • Ingeniería de manufactura

    Áreas temáticas:

    • Dirección general
    • Fabricación
    • Administración pública y ciencia militar

    Contribuidores: