Integrated Design of Building Projects: From BIM to Additive Manufacturing
Abstract:
This chapter explores key aspects of integrated project design using the extreme collaboration methodology, which enables the construction of BIM models that integrate architecture, structures, and MEP, using a “war room” or “information room” (i-room) where various project specialists interact in real time. To achieve the highest degree of integration within a project, the BIM model is then sent to a robotic arm that through additive manufacturing techniques, prints concrete elements previously designed in the i-room—in short, total machine–machine integration (BIM-robot).
Año de publicación:
2022
Keywords:
- BIM-robot
- Concrete elements
- Total machine–machine integration
- robotic arm
Fuente:
scopus
Tipo de documento:
Book Part
Estado:
Acceso restringido
Áreas de conocimiento:
Áreas temáticas:
- Materiales y estructura arquitectónica
- Construcción de edificios
- Dirección general