Integrated Design of Building Projects: From BIM to Additive Manufacturing


Abstract:

This chapter explores key aspects of integrated project design using the extreme collaboration methodology, which enables the construction of BIM models that integrate architecture, structures, and MEP, using a “war room” or “information room” (i-room) where various project specialists interact in real time. To achieve the highest degree of integration within a project, the BIM model is then sent to a robotic arm that through additive manufacturing techniques, prints concrete elements previously designed in the i-room—in short, total machine–machine integration (BIM-robot).

Año de publicación:

2022

Keywords:

  • BIM-robot
  • Concrete elements
  • Total machine–machine integration
  • robotic arm

Fuente:

scopusscopus

Tipo de documento:

Book Part

Estado:

Acceso restringido

Áreas de conocimiento:

    Áreas temáticas:

    • Materiales y estructura arquitectónica
    • Construcción de edificios
    • Dirección general