Performance analysis by working day in the placement of techano brick


Abstract:

Considering the current economic and social situation that we are going through, which forces the construction companies of the city of Cuenca to optimize costs that allow them to be competitive in the current economic situation. Considering the different scenarios that can occur in a high-rise building, several of them are analysed, which allow the gradual increase in the performance of workers in the placement of techano brick, with the aim of improving the construction processes that are carried out in the different works of the city of Cuenca - Ecuador, which is where the study is carried out, with the definition of specific tasks of the workers and with the help of mechanical and seasonal equipment that directly affect the sequential increase of the units placed by day. The information is gathered from surveys conducted among construction residents and builders in charge of staff in the city.

Año de publicación:

2022

Keywords:

    Fuente:

    scopusscopus

    Tipo de documento:

    Conference Object

    Estado:

    Acceso restringido

    Áreas de conocimiento:

    • Ingeniería de manufactura

    Áreas temáticas:

    • Física aplicada