Production planning of parallel resources considering yields, failures and production costs
Abstract:
Effective production planning of manufacturing networks requires careful consideration of several factors, including capacity, production, yields, and resource failure costs. This is particularly critical in highly variable environments where multiple resource types are available during the planning and implementation processes. This paper presents a model to aid the decision makers to determine what production resources to select, and the amount of production to allocate to each resource in order to minimise the total costs. The model considers costs associated with the production resources and customer related costs such as late delivery and loss due to undelivered units. Sensitivity analysis is conducted to examine the robustness of the optimal solution with respect to late delivery costs and loss costs. The results demonstrate the usefulness of the model by providing insights into the interactions among the cost and resource variables. © 2014 Inderscience Enterprises Ltd.
Año de publicación:
2014
Keywords:
- Risk modelling
- Supply chain management
- Manufacturing networks
- Yield modelling
Fuente:

Tipo de documento:
Article
Estado:
Acceso restringido
Áreas de conocimiento:
- Ingeniería de manufactura
Áreas temáticas de Dewey:
- Dirección general