Propuesta de creación de ordenanza para la recuperación de inversiones realizadas en obras de construcción de matrices de agua potable y alcantarillado ejecutadas en el sector rural de la ciudad de Cuenca 2010 - 2018
Abstract:
The Contract Management model used by ETAPA EP to recover public investment in rural areas has made it an obligation for citizens to pay values inconsistent with the real cost of the various projects carried out in these areas. The contribution delivered by the Company is based on subjective criterion, where the citizens’ socio-economic conditions are not taken into consideration, and therefore the method of recovering funds causes economic and social inequities. It is important to note that the current Ecuadorian legal regulations do allow for the recovery of public investment in the rural area through the “Special Contribution of Improvements”, this is fair and more equitable since the real cost distribution considers bkp_redistribution parameters such as the appraisal and total area of the property and it also recognizes people’s right to access special exemptions and discounts, thus generating a greater or lesser tax obligation for those taxpayers identified as beneficiaries of these special programs.
Año de publicación:
2019
Keywords:
- AVALUO
- Ordenanza
- Costos
- Administracion Tributaria
- inversión pública
- Sector rural
Fuente:

Tipo de documento:
Master Thesis
Estado:
Acceso abierto
Áreas de conocimiento:
- Política pública
Áreas temáticas de Dewey:
- Consideraciones generales de la administración pública
- Transporte
- Ingeniería hidráulica