Study for determination of projected maximum unit demand case study: Cuenca-Ecuador


Abstract:

This paper aims to propose a methodology for the capacity estimation of transformers within Centrosur concession area in Cuenca. The study is based on measurements made with quality equipment, records of electrical energy consumption of the users involved, demographic data, growth rate, socioeconomic conditions collected from different official bodies such as Ministries and National Agencies.