Technical, financial, economic and environmental pre-feasibility study of geothermal power plants by RETScreen–Ecuador's case study


Abstract:

A technical, financial, economic and environmental analysis of geothermal power plant developments in the Ecuadorian context was analysed by RETScreen-International Geothermal Project Model. Three different scenarios were considered. Scenario I and II considered incentives of 132.1 USD/MWh for electricity generation and grants of 3 million USD. Scenario III considered the geothermal project with an electricity export price of 49.3 USD/MWh. Scenario III was further divided into IIIA and IIIB case studies. Scenario IIIA considered a 3 million USD grant while Scenario IIIB considered an income of 8.9 USD/MWh for selling heat in direct applications. Modelling results showed that binary power cycle was the most suitable geothermal technology to produce electricity along with aquaculture and greenhouse heating for direct use applications in all scenarios. Financial analyses showed that the debt payment would …

Año de publicación:

2018

Keywords:

    Fuente:

    googlegoogle

    Tipo de documento:

    Other

    Estado:

    Acceso abierto

    Áreas de conocimiento:

    • Energía renovable
    • Política energética
    • Energía renovable

    Áreas temáticas de Dewey:

    • Física aplicada
    • Economía de la tierra y la energía
    • Ecología

    Contribuidores: