A model for performance management and estimation


Abstract:

Traditional cost estimation models in software engineering are based on the concept of productivity defined as the ratio of output to input; for instance, detailed software estimation models, such as COCOMO, can take multiple factors into account, but their multipliers lead to a single perspective based on the productivity concept. A less explored relationship in software engineering is the one between productivity and performance. This paper presents some classic concepts on the multidimensionality of performance, and proposes some suggestions to implement multidimensional performance models in software engineering based on certain fundamental concepts from geometry, that is, the QEST/LIME family of models. © 2005 IEEE.

Año de publicación:

2005

Keywords:

  • QEST/LIME
  • Estimation
  • Cmmi
  • Performance Management
  • cocomo

Fuente:

scopusscopus

Tipo de documento:

Conference Object

Estado:

Acceso restringido

Áreas de conocimiento:

  • Gestión
  • Modelo matemático

Áreas temáticas:

  • Dirección general
  • Gestión y servicios auxiliares
  • Programación informática, programas, datos, seguridad

Contribuidores: