Assessing power transformer final failure consequences using fuzzy logic


Abstract:

This paper presents a method for assess the risk index in a power transformers park, risk index is a metric that allows park administrator to ensure an optimal physical asset management, allocating properly financial and human resources in operation and maintenance actions. Assessing risk index requires calculating two secondary sub-index termed failure probability and consequence factor. Those indexes are integrated into the risk index value. In order to illustrate this process, 16 units risk index is evaluated, those units operates in the national Ecuadorian electric grid, results and discussion are finally presented.

Año de publicación:

2017

Keywords:

  • Final failure
  • Risk index assessment
  • Oil test
  • Power transformer

Fuente:

googlegoogle
scopusscopus

Tipo de documento:

Conference Object

Estado:

Acceso restringido

Áreas de conocimiento:

  • Lógica difusa

Áreas temáticas:

  • Física aplicada
  • Métodos informáticos especiales
  • Sistemas