Mostrando 10 resultados de: 13
Filtros aplicados
Publisher
Applied Sciences (Switzerland)(2)
Proceedings of the LACCEI international Multi-conference for Engineering, Education and Technology(2)
Arquiteturarevista(1)
Buildings(1)
EMJ - Engineering Management Journal(1)
Área temáticas
Dirección general(8)
Construcción de edificios(5)
Ciencias de la computación(3)
Estructuras públicas(2)
Física aplicada(2)
Área de conocimiento
Ingeniería civil(4)
Ciencias de la computación(2)
Simulación(2)
Comunicación(1)
Desarrollo económico(1)
Origen
google(3)
Behavior and performance of bim users in a collaborative work environment
ArticleAbstract: Collaborative work in Building Information Modeling (BIM) projects is frequently understood as the iPalabras claves:Behavioral patterns, Building information modeling (bim), Collaborative environment, Log data mining, Modeling performanceAutores:Forcael E., Leighton F., Martínez-Rocamora A., Nope-Bernal A., Rodrigo García-Alvarado, Sepúlveda-Morales J.Fuentes:scopusDevelopment of communication protocols between bim elements and 3D concrete printing
ArticleAbstract: Historically, the construction industry has exhibited slow technological development when compared tPalabras claves:3D concrete printing, additive manufacturing, Building Information Modeling, Communication protocolsAutores:Forcael E., Orozco F., Pérez J., Rodrigo García-Alvarado, Sepúlveda-Morales J., Vásquez Á.Fuentes:scopusArchitectural and management strategies for the design, construction and operation of energy efficient and intelligent primary care centers in Chile
ArticleAbstract: Primary care centers are establishments with elevated social relevance and high operational energy cPalabras claves:Architectural strategies, Energy efficiency, hospitals, Intelligent buildings, Primary care centersAutores:Bobadilla Moreno A., Forcael E., Nope-Bernal A., Rodrigo García-Alvarado, Rubio-Bellido C.Fuentes:scopusEvaluation of extreme collaboration with bim modeling for the teaching of building projects
ArticleAbstract: Building information modeling (BIM) has emerged as a digital platform for building projects, which fPalabras claves:Building information modelling, Collaborative Teaching, Integrated DesignAutores:Forcael E., Pulido-Arcas J.A., Rodrigo García-AlvaradoFuentes:scopusOntological models for simulation of building construction processes
Conference ObjectAbstract: The construction industry has a series of own practices and methods; which specifically depends on ePalabras claves:Constructive processes, Ontological models, Residential buildings, SimulationAutores:Carlos Raul Rodriguez, Forcael E., Orozco F., Ramis F., Salgado M.Fuentes:scopusImproving performance of infrastructure projects in developing countries: an Ecuadorian case study
ArticleAbstract: Improving the quality of infrastructure is crucial for sustainable development. Providing infrastrucPalabras claves:DEVELOPING COUNTRIES, ECUADOR, infrastructure, project management, Project performanceAutores:Agdas D., Carlos Raul Rodriguez, Forcael E., McDermot E., Rose T.Fuentes:googlescopusIntegrated Design of Building Projects: From BIM to Additive Manufacturing
Book PartAbstract: This chapter explores key aspects of integrated project design using the extreme collaboration methoPalabras claves:BIM-robot, Concrete elements, robotic arm, Total machine–machine integrationAutores:Forcael E., Pulido-Arcas J.A., Rodrigo García-Alvarado, Soto-Muñoz J.Fuentes:scopusLessons learned from an engineering doctoral program created in the developing countries context
Conference ObjectAbstract: Several universities have shown significant progress in the implementation of educational models oriPalabras claves:Engineering doctoral program, Lessons Learned, Powering R+D in the industryAutores:Ándres I. Ávila, Forcael E., Tenreiro C.Fuentes:scopusSimplified scheduling of a building construction process using discrete event simulation
Conference ObjectAbstract: Planning and Scheduling tools used by construction professionals nowadays not always consider the efPalabras claves:Building Construction, Discrete event simulation, PERT, Simplified SchedulingAutores:Carlos Raul Rodriguez, Forcael E., González M., Miriam Peña González, Ramis F., Soto-Muñoz J.Fuentes:googlescopusRisk Identification in the Chilean Tunneling Industry
ArticleAbstract: This article aims to identify the main risk factors that are threats to meet the objectives of tunnePalabras claves:construction, Decision Making; Risk Management, Probability–Severity, project management, Risk managementAutores:Agdas D., Carlos Raul Rodriguez, Forcael E., León C., Morales H.Fuentes:googlescopus